Installation Of A Punawai
Completion of one of our puna wai projects- a 500,000 gallon water reservoir up in the Kula area
Preparing The Fruit Orchard
Woodchips are delivered and spread out over the entire orchard area in preparation of planting fruit trees
Installation In Wailuku Heights
Just about finished with the brick edging and ready to plant the bare soil with grass
The Installation Of A Hawaiian Arboretum; Kipuka Park
The boulders being cemented in place to form the "kipuka" or planting areas
The length of the 250 foot hillside was trenched for irrigation
The kipuka continued to be built along the span of the entire hillside; a total of 5 kipuka that were planted with indigenous and endemic native Hawaiian plants, shrubs, trees and groundcover
Installation At Maui Lani
Implementing a brick edging to isolate the planting beds from the turf area.
Palm Planting In Maui Meadows





